Building automation

Yihua Intelligent — engineering every project with care, building satisfied customer quality.

Put the building's shared plant on one platform: clear interfaces, efficient connection and energy savings that can be verified.

Building automation and energy management platform
BABuilding Automation
05 · Building Automation

Shared plant only — never process control

Building automation (BA) monitors and controls HVAC, water supply and drainage, shared plant and lift status centrally. Control of production equipment belongs to the process discipline. The boundary between the two is fixed in writing at the communication port of the control cabinet, so responsibilities are clear and acceptance does not become a dispute.

Brand support: building automation runs on the GVS K-BUS (KNX) system, compliant with ISO/IEC 14543, bringing lighting, shading, HVAC and energy monitoring onto one network. Yihua Intelligent is an authorised GVS Smart distributor.

  • Interfaces fixed before work starts

    The monitoring point schedule is confirmed with the process control, HVAC, water and electrical disciplines and then frozen, so additions and removals do not churn during construction.

  • Communication first

    Where chillers, inverters and pump control cabinets already have their own controllers, they connect over Modbus or BACnet — far fewer cables and IO modules.

  • Data forwarded to one platform

    Operating data and alarms travel through IBMS to the energy platform and the smart factory platform, with linkage strategies configured in one place.

  • Architecture

    Three layers: management, control, field

    The management layer sets strategy and trends, the control layer does real-time regulation, and the field layer connects the mechanical and electrical equipment.

    L3

    Management layer

    The BA server with its graphical interface, zone and time-of-day strategies, and trend analysis; data forwarded to IBMS and the energy platform.

    L2

    Control layer

    DDC controllers with IO modules and BACnet or Modbus gateways, located in local control cabinets or ELV rooms close to the equipment they serve.

    L1

    Field layer

    Air handling units, ventilation fans, water pumps and tank levels; switchgear and lifts are monitored only, never controlled.

    Scope

    Typical connection scope

    01

    HVAC

    Group control of heat and cool sources, air handling units and fan coils; zone and time-of-day start/stop, temperature and humidity interlocks and variable speed regulation.

    02

    Water, power and lifts

    Pump rotation and tank level control, distribution parameters and fault alarms; switchgear and lifts are monitored for status only.

    03

    Common-area lighting

    Scheduling, presence detection and constant illuminance control for corridors, car parks and facade lighting, working alongside the smart lighting system.

    04

    Energy monitoring and metering

    Separate metering of electricity, water, gas, compressed air and steam, with trend analysis and monthly energy reports.

    Principles

    Four principles that hold on site

    Verifiable energy strategies and interfaces that can be handed over — the two things that keep a BA project from being reworked.

    Interfaces fixed in writing

    Process equipment and its dedicated utilities belong to process control; the plant's shared utilities belong to BA. The boundary is drawn at the control cabinet communication port and written into the design description.

    Communication first

    Modbus and BACnet connection is preferred over hardwired point collection — fewer cables, faster commissioning, and later extension without touching containment.

    Savings that can be verified

    Zone and time-of-day start/stop, temperature and humidity interlocks, pump rotation and variable speed control. The result is checked against metering data from the energy platform — no claims without evidence.

    Point schedule frozen

    The monitoring point schedule is confirmed by the HVAC, water and electrical disciplines and then frozen; the intelligent systems team handles collection, communications, platform and presentation.

    Energy Metering

    Four tiers of metering, energy counted down to the process step

    A single building total cannot support improvement. The metering structure is built in four tiers, laying the data groundwork for green factory and carbon targets.

    01
    Site master meter
    Total electricity, water and gas for the whole site, plus municipal connection metering, reconciled against finance and energy records.
    02
    Building submetering
    Each production building, warehouse and office block metered independently, so the highest-consuming buildings are identified.
    03
    Workshop process steps
    Metered by process step — stamping, welding, painting, assembly, testing — so waste points can be found.
    04
    Key equipment
    Separate meters on air compressors, chillers and other key plant; combined with production output to calculate energy per unit of product.
    Integration

    Multi-protocol integration, linked with the whole site

    Building automation is not an island: it is planned together with smart lighting, energy monitoring and the IBMS integration platform, with linkage strategies configured in one place.

    KNX, Modbus and BACnet interoperate

    Lighting, shading, HVAC and energy connect to one platform, so several systems do not each manage one section while operators face a wall of screens.

    Linkage strategies configured once

    Temperature interlocks and linkages with access control, video and public address are configured in IBMS; alarms reach the monitoring centre and close the loop through the work order system.

    Reporting and continuous improvement

    Monthly energy reports and year-on-year, month-on-month trend analysis, with savings reviewed every month so operating cost keeps falling.

    Tell us about your project

    Send us the space, the function and the outcome you need. We reply with an approach, a system outline and a clear quotation.